The PEA, completed in October 2025, outlined the potential for a large-scale, long-life, low capex uranium project at Cebolleta. The base case contemplates average production of approximately 1.4 million pounds of U3O8 annually, with peak production of 2.0 million pounds, for total production of 18.1 million pounds over a 13-year mine life. At a base-case uranium price of US$90/lb U3O8, the PEA estimated an after-tax NPV (8%) of US$83.9 million, an after-tax IRR of 17.7% and life-of-mine after-tax free cash flow of approximately US$287 million. Total development capital was estimated at approximately US$112.7 million, including direct and indirect costs and contingency.

Importantly, the PEA also identified opportunities to potentially improve the Project’s economics. Cebolleta has significant sensitivity to both uranium prices and metallurgical recovery. At US$100/lb U3O8, the PEA’s after-tax NPV (8%) increases to approximately US$153.7 million, while increasing the assumed metallurgical recovery from the base case of 80% to 90% increases after-tax NPV (8%) to approximately US$159.3 million.

These sensitivities are informing the Company’s current work at Cebolleta. In 2026, PUR completed its sampling and drilling program and delivered material for advanced metallurgical testing aimed at evaluating uranium recovery characteristics and supporting future engineering and economic studies.  

In 2026, the Company completed its drilling program at Cebolleta and delivered samples for advanced metallurgical testing aimed at optimizing the uranium recovery assumptions contained in the 2025 PEA.

Sign Up for Email Updates